Crescent Former Tissue Machine Project

Technical Coordination and Export Shipment

BANNOR supported a customer’s crescent former tissue machine project through technical clarification, drawing coordination and export shipment arrangements. This case covers the engineering documentation and initial equipment shipments we coordinated, including machine requirements, installation-interface information and foundation-component delivery.

Bringing the Engineering Requirements Together

The technical discussions covered the information needed to connect the tissue machine specification with its installation environment. We followed up on steam and boiler requirements, electrical demand, and the evaporation and condensate calculations associated with the Yankee drying section.

We also requested and checked dimension and weight information for major components to support transport and installation planning. These discussions brought the machine requirements, utility information and handling data into the technical communication with the customer.

Coordinating Layouts and Drawing Revisions

We organised English technical information for customer review, including general assembly drawings, equipment layouts and building-layout information for the project.

The drawing review included checking the consistency of the agreed speed requirements across the assembly and layout documents. When machine parameters were revised, we followed up on the corresponding changes to related drawings and technical information.

We also requested that technical changes be marked at the relevant positions in the drawings, with the accompanying explanations placed alongside them. The aim was to make the location and meaning of each change easier to review and confirm.

Following Mechanical and Auxiliary-System Details

The documentation work extended to steam and hot-air flow diagrams, valve lists, pressure and level instrumentation, and drawings for reel-related components. We coordinated translation and clarification of this information and communicated the updates for customer review.

Our role was to follow the technical questions between these different parts of the project and keep the customer informed as the documents were updated. The work included both equipment information and the details needed to prepare the installation interfaces.

Preparing Equipment Information for Export

For shipment preparation, we collected and checked the available photographs, overall dimensions and weights. The records included large paper-machine components and related equipment such as pressure screens and vibrating screens.

We used this information in shipment preparation and followed up on the goods-handover information, packing details and export documents for the relevant batches. Container arrangements and shipping information were coordinated with the customer’s logistics contacts.

Coordinating Foundation-Component and Equipment Shipments

Foundation components were dispatched in an early shipment. We followed up after arrival and coordinated the supporting product-list and clearance documentation required for that batch.

For the other equipment shipments covered in this case, we followed the goods lists, shipping documents and customer confirmation of the export information. These shipments involved separate equipment batches, with documentation handled for the goods included in each batch.

The work brought together drawing updates, equipment records and shipment documentation for the customer. BANNOR provided a point of contact for the technical questions and export arrangements connecting these activities.

Discuss Your Tissue Machine Project

For a crescent former tissue machine enquiry, send us your intended tissue grades, target production requirements, available building layout and utility conditions. Please also identify the equipment scope and any installation-interface requirements.

We can review this information with you and clarify the scope for equipment selection, technical coordination, inspection and shipment planning. Contact BANNOR to discuss your tissue paper machinery project.